Retail window displays in Dubai: what three brand campaigns taught us
This year we built campaign windows for Columbia, The North Face and Under Armour in malls across Dubai and Abu Dhabi. Each brand had a different product and a different look, but the same questions came up every time: will the window look like the mock-up, will it hold up for the whole campaign, and who answers the phone when something moves. Here is what we built and what we learned.
Columbia: Cool Hike Pro
Columbia launched its Omni-Freeze Zero Ice cooling shirt with men’s and women’s windows and an entry display in its Dubai stores.

The rocks are styrofoam, carved by hand in our workshop and painted to match the desert photography in the key visual. They sit on a two-layer MDF base wrapped in printed vinyl, with warm LED light underneath so the base glows. Behind the mannequin, a UV-printed fabric graphic fills the store’s light box, and “Our coolest innovation” stands in 3D white acrylic letters. Inside the stores, the same job covered key visuals, a footwear wall for the Tellurix shoe with acrylic shelves, a printed table top and shelf talkers.
Columbia came back to us for the following launches: Hike Pro and Enthusiast, then the Run Trail and Ski Enthusiast windows across the UAE.
The North Face: Nuptse
The North Face launched its Nuptse down jacket this autumn with windows in Dubai and Abu Dhabi.

Each window holds a display box built from an aluminium frame with LED lighting inside and a printed light-pass fabric skin. The jacket sits inside, lit in deep blue, and the Nuptse name reads from across the mall walkway. Every store front is a different size, so each store got its own mock-up and its own box dimensions before we started production. The team installed early in the morning, and the windows were finished before the malls opened.
Under Armour: Velociti Pro
Under Armour launched its Velociti Pro running shoe with windows in Dubai malls. The line is “Built for every mile”: a runner mid-stride over stepped, lit panels, with the shoes lined up beside him. The photo is from Mall of the Emirates. At the end of the campaign our team took the displays out under the mall’s removal permit.

What we learned across all three
The mock-up has to be the window. As a window display design company in Dubai, we design and build under one roof, so the 3D mock-up the brand approves uses the real materials and the real store measurements. If the render shows a glowing base and carved rocks, the window has a glowing base and carved rocks. Brand teams use the mock-ups for their own approvals and procurement, so they need to be right the first time.
Samples before production. Before we print the full run, the brand sees samples of the fabric print, the colours and the finish. A colour that looks right on screen can print darker on fabric, and it is cheaper to catch that on a sample than on the finished windows.

Quality that lasts the campaign. A window is on show for weeks, under strong lights, with staff working around it. We build bases in solid MDF, frames in aluminium and fabric graphics with silicone-strip edges that stay tight in the frame. When something does move, we go back and fix it within days.
Talk before, during and after. Brand teams often work across many stores and agencies at once. We send updated mock-ups after every round of feedback, confirm the install plan with each store, and stay on call after the windows go in. Removal at the end of the run is part of the job, not a separate request.
Mall permits take paperwork. Every install and every removal needs a mall permit. The store applies, and we supply the documents: our trade licence, Emirates ID, visa and passport copies for the team, third-party liability insurance and the fire test report for the MDF we use. We keep the set ready so a launch never waits on a missing document.

FAQ
How long does a campaign window take in Dubai?
A few weeks from brief to install. Design and mock-ups come first, then samples, then production, with the mall permit running alongside.
Can one window design roll out to several malls?
Yes. The Nuptse window ran in malls across Dubai and Abu Dhabi. Each store gets its own mock-up so the design fits its glass and light box.
Do you install outside mall hours?
Yes. Window work happens early in the morning before the mall opens or at night after it closes, under the store’s permit.
Do you remove the window after the campaign?
Yes. We take it out at the end of the run under a removal permit.
Do you build permanent shop fittings or shelving?
No. We build campaign windows and in-store launch pieces that change with each season.